MotirBuilding in public
MOTIR · moooon
onMotir
You’re viewing a public project. Anyone can view it — no account needed. Sign in to submit, upvote, or comment on requests.View-only — you can’t edit work items

Work item tree

A read-only, expandable view of this project’s public work items.

Title
Status
Priority
MOTIR-349012 Roadmap root level draws every parentless bug as a top-level node beside the epics, and its 200-row cap then drops the NEWEST epics silently
Done
Medium
MOTIR-3493(motir-core) Design — the roadmap ROOT level's non-epic rows: the grouped defects node, the level it drills into, and a cap that is visible rather than silent
Done
Medium
MOTIR-352215 3D / Immersive leaves 199 of 280 interactive controls flat — the physical-key rule matches `rounded-(--radius-btn)` only, so Plan with AI, Re-plan, the 3-dots menu and the roadmap search have no depth (motir-core)
Done
Medium
MOTIR-3524(motir-core) The re-plan submit SETS `context.replanTrigger` — MOTIR-3324 ships a consumer that nothing populates
To do
High
MOTIR-355716 Roadmap: a level draws edges whose BLOCKED end is not on it — "Not in an epic" redraws the whole EPIC chain as 12 anonymous "blocked elsewhere" ghosts, and the root draws a grouped task as one
Done
High
MOTIR-3580The token-permission picker's design asset is THREE rows behind its measurement — re-measure the two-column split, or say the numbers are no longer drawn
To do
Low
MOTIR-3623(motir-ai) The lesson-delivery guard still reads the PRE-`occ:` marker grammar, so the first migration generated after MOTIR-3552 fails CI on a correct corpus
Done
High
MOTIR-3759(motir-core) The code-graph refresh costs ~35 minutes to re-derive a graph that measures 32 seconds — index ONCE per repo, and reach `codegraph sync`
To do
Medium
MOTIR-3760(motir-core) A merge reaches production hours late — `Deploy to Fly` sits behind the whole verification matrix a second time, and a merge burst leaves only the newest run
To do
Medium